Pengalaman Kami

Pengalaman Kami

1. 
Project   : Pekerjaan Canopy Container, Access Stair and Platform
Periode  : Januari 2021
Lokasi     : Krikilan, Rembang, Jawa Tengah
Client      : PT. PHE Randugunting

2.
Project   : Fabrication & Painting Fasprod MUDI-26
Periode  : December 2020 - Januari 2021
Lokasi     : Soko, Tuban, Jawa Timur
Client      : PT. PHE Tuban East Java 

3.
Project   : Replacement Temporary Buoy with Permanent Buoy 165.000 DWT 
Periode  : October - November 2020
Lokasi     : Balongan, Indramayu, Jawa Barat
Client      : PT. Pertamina RU VI Balongan (Owner) - PT. Rekayasa Industri (Main Contractor)

4.
Project   : EPCI POD-I Lapangan Randugunting
Periode  : November 2019 - Januari 2020
Lokasi     : Krikilan, Rembang, Jawa Tengah
Client      : PT. PHE Randugunting (Owner) - PT. Patra Drilling Contractor (Main Contractor)

5.
Project   : Provision & Installation Sarana Bantu Navigasi Pelayaran (SBNP) SPL/SPM Project
Periode  : Oktober - Desember 2018
Lokasi     : Balongan, Indramayu, Jawa Barat
Client      : PT. Pertamina RU VI Balongan

6.
Project   : Fabrication & Installation SPL/SPM Crossover
Periode  : Juli - Oktober 2018
Lokasi     : Balongan, Indramayu, Jawa Barat
Client      : PT. Pertamina RU VI Balongan

7.
Project   : FPSO Seagood 101 Offshore Decommissioning
Periode  : November - Desember 2017
Lokasi     : Madura, Jawa Timur
Client      : Santos Ltd (Owner) - PT. Apexindo Pretama Duta (Main Contractor)

8.
Project   : Swaping Aberkha on Poleng Offshore Area PHE WMO Field
Periode  : October 2017
Lokasi     : Madura, Jawa Timur
Client      : PT. PHE West Madura Offshore (Owner) - PT. Patra Drilling Contractor (Main Contractor)

9.
Project   : Ullage Tank Certification
Periode  : Februari - April 2017
Lokasi     : Madura, Jawa Timur
Client      : Santos Ltd (Owner) - PT. Apexindo Pretama Duta (Main Contractor)

10.
Project   : LPG FSO Concord Offshore Decommissioning
Periode  : Agustus - November 2016
Lokasi     : Natuna, Kepulauan Riau
Client      : ConocoPhilips (Owner) - PT. Warma Trierindo (Main Contractor)

11.
Project   : Offshore Piling and Erection Upper Structure Breasting Dolphin and Mooring Dolphin
Periode  : Agustus - December 2014
Lokasi     : Meulaboh, Aceh Barat
Client      : PT. Media Djaya Bersama (Owner) - PT. Warma Trierindo (Main Contractor)